Client: Vinci Construction for a leading car manufacturer i54 Wolverhampton
Area: MH1
Requirement: Access scaffold platform to SS5 Partition wall
A free-standing scaffold structure was required by VCUK to enable the completion of a Middas partition wall. Due to the nature of the wall finish, the scaffold could not be tied into the structure so a buttress scaffold was required to stabilise the scaffold.
Airwright Midland design partner Reactive Design produced a bespoke design for a scaffold that was 30m in length and 14m high with a 2KN/m² live load allowance @ 1 no lift